Client: Stockland | Location: Altona North

 

The Design & Construct project consists of a new 5,000m2 100 tonne rated post tensioned concrete container hardstand, refurbishment works to the existing facility including floor levelling, new loading docks and the construction of a 3,220m2 Cool Room incorporating Force Air Rooms. 

This is the third port related logistics operator Texco has designed and constructed for in Toll Drive, Altona.