Client: Arrow Transport Logistics | Location: Altona North

The Design & Construction of a facility sitting on 2.48ha of land and featuring a 4,500m2 warehouse, 407m2 two level office and a 6,000m2 115 tonne rated post-tensioned concrete container rated hardstand with the capacity to store loaded containers 5 high.

The facility was successfully delivered within a very tight timeframe with town planning, design documentation, construction and occupation taking a total of 8 months to complete.